Hugh Allan Sidewalk Project

Timeline: 
2018
Status: 
Past
Type: 
Roadway
Estimated cost: 
$210,000 combined with Bank Road Project
Contact: 
KLL Construction LTD

Project Scope

The City of Kamloops has contracted KLL Construction Ltd. to carry out the installation of concrete sidewalk behind the existing curb between Lodgepole Drive and 1920 Hugh Allan Drive (Pineview Heights).

The project includes:

• installation of concrete infill sidewalk, complete with sidewalk gravel structure
• removal of tree stump and trimming of foliage
• boulevard restoration

Hours of Work 

Construction will begin on August 22, and completion is anticipated for early fall.  Construction is scheduled to occur Monday to Friday, 7 am to 5 pm. 
 

Resident Impacts

Residents are advised that throughout the construction period vibratory compaction equipment may be in use; therefore, any fragile items should be packaged or protected from damage due to vibration.  There may also be noise disruption due to equipment on site.
 
The City bus stop located on the north side of the street will be temporarily relocated. 
 

Traffic Impacts

Please obey all traffic control personnel, equipment, and signage when driving or walking in the vicinity of the construction.
 
If you have any questions, please contact our Civic Operations Department via email at publicworks@kamloops.ca or call 250-828-3461.