Hillside Drainage Improvement Project 2016 /2017

In July 2014, the City of Kamloops experienced a significant storm event which resulted in damage to portions of the drainage system for Hillside Drive between Summit Drive and McGill Road. The City employed Urban Systems to assess the current condition and provide a design for restoration and improvements for the drainage network in the area. The contract for this project has been awarded to Dawson Construction, to commence Thursday, October 20, 2016, until approximately the end of November, with work to resume in the spring.

The project will consist of:

  • Construction of a storm drainage pipe network approximately between Hillside Drive and Summit Drive;
  • Construction of headwalls to collect surface drainage;
  • Construction of a detention pond within the hairpin of Summit Drive;
  • Extension of the existing storm network in the area to the new detention pond; and
  • Construction of a controlled outlet structure from the detention pond.

Project complete Spring 2017



Customer Service
Report an Issue

Contact
Public Works and Utilities
955 Concordia Way
Kamloops BC V2C 6V3
ph 250-828 3461
email publicworks@kamloops.ca

Note: All correspondence is entered into our system and will be directed accordingly. The City of Kamloops will endeavor to contact you within two business days. Thank you.